Parkleigh Residents' Association Submission

Uimhir Thagarta Uathúil: 
SD-C444-23
Stádas: 
Submitted
Údar: 
Antonio Marin
Líon na ndoiciméad faoi cheangal: 
1
Teorainneacha Gafa ar an léarscáil: 
Níl
Údar: 
Antonio Marin

Observations

Parkleigh RA' objection to relocating the bridge

Caibidil: 
Ábhair: 

This submission is made by Parkleigh Residents’ Association, SDCPPN-1366. Parkleigh is
the first residential development in the new neighbourhood of Seven Mills, part of the
Clonburris SDZ.

We wrote about this submission on our website:
https://www.parkleighra.ie/2026/09/26/consultations-for-clonburris-sdz-material-amendments/

While our Association supports sustainable urban development and the principle of modal
shift toward active travel and public transport, we wish to formally lodge an Objection to
Amendment No. 2, Amendment No. 3, and Amendment No. 9 of the Proposed Material
Amendments to the Clonburris SDZ Planning Scheme 2019.

Our objections stem from premature infrastructure reductions, lack of current public transport
infrastructure, and the negative impact these amendments will have on safety, traffic
congestion, and residential amenity.

We object to relocating and downsizing this bridge. Retaining a full-sized bridge in its original
location will work much better for the community over the long term.

  • The original location provides a direct, uninterrupted route connecting the Grand
    Canal Greenway, South Link Street, Northern Link Street, and the Urban Core.
    Moving the bridge forces pedestrians and cyclists through local residential roads,
    creates unnecessary detours on a primary transit route, and pulls foot traffic further
    away from local schools.
  • We anticipate this bridge will be heavily used by cyclists, runners, families with
    buggies, dog walkers, and wheelchair users. A downsized bridge will inevitably
    create bottlenecks and won't be fit for purpose during busy periods.

     

Parkleigh RA' objection to downsizing the car bridge

Caibidil: 
Ábhair: 

This submission is made by Parkleigh Residents’ Association, SDCPPN-1366. Parkleigh is
the first residential development in the new neighbourhood of Seven Mills, part of the
Clonburris SDZ.

We wrote about this submission on our website:
https://www.parkleighra.ie/2026/09/26/consultations-for-clonburris-sdz-material-amendments/

While our Association supports sustainable urban development and the principle of modal
shift toward active travel and public transport, we wish to formally lodge an Objection to
Amendment No. 2, Amendment No. 3, and Amendment No. 9 of the Proposed Material
Amendments to the Clonburris SDZ Planning Scheme 2019.

Our objections stem from premature infrastructure reductions, lack of current public transport
infrastructure, and the negative impact these amendments will have on safety, traffic
congestion, and residential amenity.

We object to this change as we believe it will cause more traffic congestion on the other two
junctions and will restrict our connections.

  • Completely removing vehicular connectivity across the railway line forces all
    north-south traffic onto surrounding external arterial roads (such as Fonthill Road /
    R113 and the local road network).
  • As highlighted in the Council’s own Bridge Removal Assessment Modelling Report
    (Systra, 2025), removing this vehicular link results in significant traffic rerouting. The
    report states the following: An issue was identified in both the AM and PM for
    this junction. The impacts of the road removal may require mitigation to address
    the impact at this junction.

Parkleigh RA' objection to car parking changes

Caibidil: 
Ábhair: 

This submission is made by Parkleigh Residents’ Association, SDCPPN-1366. Parkleigh is
the first residential development in the new neighbourhood of Seven Mills, part of the
Clonburris SDZ.

We wrote about this submission on our website:
https://www.parkleighra.ie/2026/09/26/consultations-for-clonburris-sdz-material-amendments/

While our Association supports sustainable urban development and the principle of modal
shift toward active travel and public transport, we wish to formally lodge an Objection to
Amendment No. 2, Amendment No. 3, and Amendment No. 9 of the Proposed Material
Amendments to the Clonburris SDZ Planning Scheme 2019.

Our objections stem from premature infrastructure reductions, lack of current public transport
infrastructure, and the negative impact these amendments will have on safety, traffic
congestion, and residential amenity.

We object to this proposed amendment, particularly the Council’s intention to avoid
allocating individual parking spaces to residents.

  • Residents in developments such as Parkleigh and Cooper Square already have
    allocated parking. We are concerned about what the proposed changes would mean
    for existing developments and how parking would be managed and enforced in
    practice.
  • Unallocated parking directly contradicts the Council’s push for EV adoption. In
    existing developments like Parkleigh, allocated spaces allow residents to invest their
    own money in installing home EV chargers. Without assigned spaces, neither
    residents nor Owners’ Management Companies (OMCs) have certainty about where
    to install EV chargers or who will cover the cost. This leaves neighbourhoods stuck
    with the minimum 10% provision.
  • These restrictions are being introduced before public transport projects (DART+ SW,
    BusConnects) are delivered. Until viable alternatives exist, restricting resident
    parking will only lead to overspill onto surrounding roads.

Instead of prematurely restricting resident parking, we ask South Dublin County Council to
consider the following practical measures:

  • Investigate the use of undeveloped building sites (e.g. future school or employment
    building site) as a temporary overflow parking until public transport projects are
    delivered.
  • Increase commuter and visitor parking near the urban cores.
  • Launch an SDCC bike-sharing scheme, using Clonburris and Adamstown as
    high-density pilot locations, utilising the Grand Canal Greenway as one of the key
    corridors.
     

Faisnéis

Uimhir Thagarta Uathúil: 
SD-C444-23
Stádas: 
Submitted
Líon na ndoiciméad faoi cheangal: 
1
Teorainneacha Gafa ar an léarscáil: 
Níl