fa-printPriontáil
Baile
Uimhir Thagarta Uathúil: 
SD-C195-2
Stádas: 
Submitted
Submission: 
R112 S5 Orbital Bus Route
Údar: 
Future Of Dublin
Comhairliúchán: 
Draft South Dublin County Development Plan 2022 - 2028
Dáta a cuireadh isteach: 
19.07.2021 - 16:14

Litir Chumhdaigh

My name is Colm Garvey representing a local transport lobbying group called "Future of Dublin".

The motivation behind our submission is threefold:

1) To contribute an idea to the "10 minute neighbourhood" objective

2) To receive South Dublin County Councils support as we lobby the NTA for our Bus Connects amendment

3) To increase the SDCC Target Mode Share for "Bus" from a mere 20% to over >23%

Observations: 
Volume 1: Written Statement
Caibidil: 
Volume 1: Written Statement

Proposal:
1) Addition of new S5 orbital bus route along the R112 (Walkinstown Avenue-Dundrum) to be added to New Dublin Bus Area Network as part of Bus Connects Network Redesign and single fare structure.
2) Addition of segregated cycle paths along R112 similar to what has been achieved on Braemor Road section with added separation between Bus Stops and cyclists.

Full details of our proposal can be found here: https://futureofdublin.ie/templeogue3.html

The proposal above if implemented would make a significant contribution to the stated objectives of your document.

For example, it would contribute to:

SM3 Objective 4: "...increase catchment and maximise permeability"

SM3 Objective 5: "...facilitate an interlinked network that maximizes the efficiency of existing services"

SM3 Objective 6: "...including orbital routes to provide connectivity between outer suburban areas" 

Kind regards,

Colm Garvey 

 

 

Ceangaltáin: 
fa-file-imageSD-C195-2-7496 - coulddo.png
fa-file-imageSD-C195-2-7497 - whereistheS5.jpg
fa-file-imageSD-C195-2-7498 - Screenshot_32.png
fa-file-imageSD-C195-2-7499 - dc9f4fa.bus-replaces-30-cars.png
Teorainneacha Gafa ar an léarscáil: