fa-printPriontáil
Baile

Objection to amendment no. 3

Uimhir Thagarta Uathúil: 
SD-C444-34
Stádas: 
Submitted
Submission: 
Objection to planned amendments
Údar: 
Sudip Andayil
Comhairliúchán: 
Clonburris Proposed Material Amendment to the Clonburris Strategic Development Zone Planning Scheme 2019
Dáta a cuireadh isteach: 
28.09.2026 - 17:43

Observation

Objection to amendment no. 3
Caibidil: 
Amendment No.3
Ábhair: 
Amendment 3

I object to this change as we believe it will cause more traffic congestion on the other two

junctions and will restrict our connections.

•

•

Completely removing vehicular connectivity across the railway line forces all

north-south traffic onto surrounding external arterial roads (such as Fonthill Road /

R113 and the local road network).

As highlighted in the Council’s own Bridge Removal Assessment Modelling Report

(Systra, 2025), removing this vehicular link results in significant traffic rerouting. The

report states the following: A n i s s u e w a s i d e n t i fi e d i n b o t h t h e A M a n d P M f o r

t h i s j u n c t i o n . T h e i m p a c t s o f t h e r o a d r e m o v a l m a y r e q u i r e m i t i g a t i o n t o a d d r e s s

t h e i m p a c t a t t h i s j u n c t i o n .


 

Doiciméid Cheangailte: 
Níl