fa-printPriontáil
Baile

Objection to Amendment no. 3

Uimhir Thagarta Uathúil: 
SD-C444-29
Stádas: 
Submitted
Submission: 
Comments on Local Plan
Údar: 
Parjanya Sarma
Comhairliúchán: 
Clonburris Proposed Material Amendment to the Clonburris Strategic Development Zone Planning Scheme 2019
Dáta a cuireadh isteach: 
28.09.2026 - 13:01

Observation

Objection to Amendment no. 3
Caibidil: 
Amendment No.3
Ábhair: 
Amendment 3

We object to this change as we believe it will cause more traffic congestion on the other two junctions and will restrict our connections. - Completely removing vehicular connectivity across the railway line forces all north-south traffic onto surrounding external arterial roads (such as Fonthill Road / R113 and the local road network). - As highlighted in the Council’s own Bridge Removal Assessment Modelling Report (Systra, 2025), removing this vehicular link results in significant traffic rerouting. The report states the following: An issue was identified in both the AM and PM for this junction. The impacts of the road removal may require mitigation to address the impact at this junction.

Doiciméid Cheangailte: 
Níl